{"id":6812,"date":"2022-06-13T17:00:00","date_gmt":"2022-06-13T15:00:00","guid":{"rendered":"https:\/\/www.razumny.no\/?p=6812"},"modified":"2022-06-02T11:06:22","modified_gmt":"2022-06-02T09:06:22","slug":"your-lack-of-planning","status":"publish","type":"post","link":"https:\/\/www.razumny.no\/?p=6812","title":{"rendered":"Your lack of planning&#8230;"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">&#8230;is not my emergency.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A while back, a customer contacted us, saying that they either needed to have a particular piece of software* installed, or that a change* needed to be performed on one of the servers which we operate for them. The former was very much not an option, as said software was not only end of life, but had also been forcibly uninstalled due to several well-known (and readily exploitable) vulnerabilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The solution, then, was to perform the change requested. Standard maintenance work happens on a schedule, and we would simply schedule the work and go on with our day, right? Alas, not right. You see, the customer in question hadn&#8217;t planned, hadn&#8217;t checked whether the prerequisite steps had been taken in order to do what they needed to do, and now found themselves in a bit of a pickle, as they were now &#8220;unable to work&#8221;.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are, of course, several issues with this. One issue is that they have been made repeatedly aware of the problem, but have declined to have action taken previously. Another issue is the fact that the alternative solution would require some serious work which would cause downtime, not only for the system* in question, but also for a number of other systems, as they too relied on the same base system*.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The issue was, eventually, resolved in the normal order of things, but not until we&#8217;d gone three rounds with the end user, ultimately having to tell them outright that we simply weren&#8217;t able to do what they wanted in the timeframe they wanted it to be done. Not only did we not have the personnel available to do it, but both our and the customers change control systems would preclude it.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><em>*I&#8217;m being deliberately obtuse here. What software and what systems we&#8217;re talking about is entirely incidental to the narrative and the post as a whole.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8230;is not my emergency. A while back, a customer contacted us, saying that they either needed to have a particular piece of software* installed, or that a change* needed to be performed on one of the servers which we operate for them. The former was very much not an option, as said software was not [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"Your lack of planning is not my emergency - and you need to understand that.","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[521],"tags":[834,1517,1516,1515],"class_list":["post-6812","post","type-post","status-publish","format-standard","hentry","category-opinion","tag-change","tag-emergency","tag-maintenance","tag-planning"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/p2ukSU-1LS","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":5416,"url":"https:\/\/www.razumny.no\/?p=5416","url_meta":{"origin":6812,"position":0},"title":"The importance of Service Level Agreements","author":"Aleksander Nordgarden-R\u00f8dner","date":"09\/03\/2020","format":false,"excerpt":"Most IT operations shops establish some sort of service level agreement (SLA) with their users and customers. To my mind, these are equal parts commitment and expectation management. To a commercial vendor, the former is usually the focus, whereas the latter is typically the focus for an in-house vendor. Let's\u2026","rel":"","context":"In &quot;ITIL&quot;","block_context":{"text":"ITIL","link":"https:\/\/www.razumny.no\/?cat=786"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":5167,"url":"https:\/\/www.razumny.no\/?p=5167","url_meta":{"origin":6812,"position":1},"title":"Change is high-risk behavior. Nevertheless, it must be done","author":"Aleksander Nordgarden-R\u00f8dner","date":"18\/11\/2019","format":false,"excerpt":"Change is arguably one of the riskiest behaviors within IT. Whenever we make a change, things tend to break. It is in no way coincidental that one of the foci of change management is post-change incidents, i.e. the errors introduced by the changes we make. I would go so far\u2026","rel":"","context":"In &quot;ITIL&quot;","block_context":{"text":"ITIL","link":"https:\/\/www.razumny.no\/?cat=786"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6908,"url":"https:\/\/www.razumny.no\/?p=6908","url_meta":{"origin":6812,"position":2},"title":"Prioritizing value","author":"Aleksander Nordgarden-R\u00f8dner","date":"31\/10\/2022","format":false,"excerpt":"It is one of my strongly held beliefs that what we do must provide some customer value. If it doesn't, we probably shouldn't be doing it. I don't mean that we necessarily do something we can charge for (the goodwill we get by NOT charging for it can be benefit\u2026","rel":"","context":"In &quot;DevOps&quot;","block_context":{"text":"DevOps","link":"https:\/\/www.razumny.no\/?cat=1005"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2218,"url":"https:\/\/www.razumny.no\/?p=2218","url_meta":{"origin":6812,"position":3},"title":"Project Management: Three ways to look at stages","author":"Aleksander Nordgarden-R\u00f8dner","date":"04\/11\/2013","format":false,"excerpt":"My journey towards a Bachelors degree continues, now with the OU Module M258 (IT Project and Service Management). As I continue to study the module, I will write down my thoughts on various subjects. Like with my first module, TU100, these will all be collected under a category for easy\u2026","rel":"","context":"In &quot;M258&quot;","block_context":{"text":"M258","link":"https:\/\/www.razumny.no\/?cat=778"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6388,"url":"https:\/\/www.razumny.no\/?p=6388","url_meta":{"origin":6812,"position":4},"title":"Longer answers are better support","author":"Aleksander Nordgarden-R\u00f8dner","date":"17\/05\/2021","format":false,"excerpt":"When working tech support, it is often tempting to give short answers to a ticket, in order to get on to the next ticket. This tendency is particularly problematic when responding in the negative to a request. Though understandable, we should fight this tendency. I have three specific reasons why\u2026","rel":"","context":"In &quot;Opinion&quot;","block_context":{"text":"Opinion","link":"https:\/\/www.razumny.no\/?cat=521"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4314,"url":"https:\/\/www.razumny.no\/?p=4314","url_meta":{"origin":6812,"position":5},"title":"Risk management is at the heart of change management","author":"Aleksander Nordgarden-R\u00f8dner","date":"25\/02\/2019","format":false,"excerpt":"One of my many roles at work is that of change coordinator for a large subset of our customers. I have learned a lot in this capacity, and have come to feel that, while Incident Management is the natural first step in ITIL implementation, until you start implementing Change Management,\u2026","rel":"","context":"In &quot;ITIL&quot;","block_context":{"text":"ITIL","link":"https:\/\/www.razumny.no\/?cat=786"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/www.razumny.no\/index.php?rest_route=\/wp\/v2\/posts\/6812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.razumny.no\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.razumny.no\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.razumny.no\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.razumny.no\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6812"}],"version-history":[{"count":4,"href":"https:\/\/www.razumny.no\/index.php?rest_route=\/wp\/v2\/posts\/6812\/revisions"}],"predecessor-version":[{"id":6816,"href":"https:\/\/www.razumny.no\/index.php?rest_route=\/wp\/v2\/posts\/6812\/revisions\/6816"}],"wp:attachment":[{"href":"https:\/\/www.razumny.no\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.razumny.no\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.razumny.no\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}